Projects in Nuevo León
Mexico · 3 projects
| Project | Agency | Mode | Status | Alignment | Last Updated |
|---|---|---|---|---|---|
| Metrorrey Line 4 (Monorail) | Gobierno del Estado de Nuevo León | monorail | Under Construction | 7.62 km (4.7 mi) elevated monorail running west along Avenida Constitución from Hospital de Ginecología in downtown Monterrey to Pablo González, where it will meet the planned federal passenger train, with seven stations in the 2025 plan. A planned extension to Santa Catarina was dropped in 2025. The state reported works on Lines 4 and 6 at 96% (viaduct 95.6%, stations 56.7%) in September 2026; passenger service is targeted for 2027. | Nov 13, 2026 |
| Metrorrey Line 6 (Monorail) and Airport Extension | Gobierno del Estado de Nuevo León | monorail | Under Construction | 17.6 km (10.9 mi) elevated monorail from Hospital de Ginecología in downtown Monterrey through Parque Fundidora and along Avenida Miguel Alemán to Centro Apodaca, plus an extension to Monterrey International Airport. A test train reached Centro Apodaca in November 2026, but no part of the line has opened; passenger service is targeted for 2027 after a planned opening for the June 2026 World Cup was missed. | Nov 13, 2026 |
| Saltillo–Monterrey–Nuevo Laredo Passenger Train (Tren del Norte) | ATTRAPI | intercity | Under Construction | New ~396 km (246 mi) passenger line from the Saltillo area through Monterrey to Nuevo Laredo on the U.S. border, built mostly alongside existing freight tracks for 160–200 km/h diesel-electric trains, with 11 to 13 stations. Construction began in September 2025; ATTRAPI put progress near 10% in September 2026, with service expected in 2028. | Nov 13, 2026 |