Projects in Quebec

Canada · 5 projects

ProjectAgencyModeStatusAlignmentLast Updated
Alto High-Speed Rail (Toronto–Québec City)Altohigh speedPlanningPlanned ~1,000 km dedicated high-speed rail line at up to 300 km/h linking Toronto, Peterborough, Ottawa, Laval, Montréal, Trois-Rivières, and Québec City. The route is still a study corridor; Ottawa–Montréal (~200 km) is the first segment, with construction targeted to begin in 2029.Nov 13, 2026
Réseau express métropolitain (REM)CDPQ Infraheavy railUnder Construction67 km automated light metro with 26 stations on four branches. 64 km and 23 stations are in service: the South Shore branch (2023), the Deux-Montagnes branch (2025), and the Anse-à-l'Orme branch (May 2026). The last piece, a two-station branch to Montréal-Trudeau Airport, is in high-speed testing with service planned for the end of 2027. Two infill stations near the Lachine Canal are in planning.Nov 13, 2026
Gatineau–Ottawa Tramway (TramGO)MIQlight railPlanningPlanned 24 km tramway with 37 stations, as designed by the Société de transport de l'Outaouais (STO): two branches from Aylmer and the Plateau join in Hull and cross the Portage Bridge into downtown Ottawa. In February 2026 Québec moved the project to Mobilité Infra Québec, which put the full plan at about C$8B and is due to recommend a smaller, phased project to the government by November 30, 2026.Nov 13, 2026
TramCité (Québec City Tramway)CDPQ Infralight railUnder Construction19 km light rail line with 29 stations from Le Gendre in the west, through Sainte-Foy, Université Laval, a 2 km tunnel under Parliament Hill, and Saint-Roch, to Charlesbourg. Utility relocation and tunnel portal excavation are under way; main construction is due to start in 2027 once the target price is approved, with service planned for 2033.Nov 13, 2026
Blue Line Extension (Line 5)STMheavy railUnder Construction6 km underground extension of Montréal Métro Line 5 (Blue) east from Saint-Michel along Jean-Talon Street to Anjou, with five new stations. Under construction: the tunnel boring machine began its 4.6 km drive in May 2026, and the line is due to open in 2031.Nov 13, 2026