Massachusetts Bay Transportation Authority

3 tracked projects

ProjectRegionModeStatusAlignmentLast Updated
Blue Line Extension to LynnMAheavy railProposedLong-proposed ~4.5-mile extension of the Blue Line from its terminus at Wonderland in Revere to downtown Lynn, most often studied along the Newburyport/Rockport commuter rail right-of-way. The project is dormant, with no funding and no active MBTA study. State and MBTA attention in Lynn has shifted to Lynnway bus lanes and future commuter rail electrification.Nov 13, 2026
Green Line Extension to Mystic Valley Parkway (Route 16)MAlight railOn HoldProposed ~0.9-mile extension of the Green Line's Medford Branch (E branch) from Medford/Tufts along the Lowell Line commuter rail corridor to one new terminal station at Mystic Valley Parkway (Route 16). Once the second phase of the Green Line Extension, it lost its $190M in regional funding to the main project in 2016. A 2017 redesign entered state environmental review, but the project has had no funding or construction schedule since.Nov 13, 2026
Red-Blue ConnectorMAheavy railEnv. ReviewProposed ~0.4-mile Blue Line extension in a cut-and-cover tunnel under Cambridge Street from Bowdoin to a new Blue Line platform at Charles/MGH, giving the Blue and Red lines their first direct transfer; Bowdoin station would close. The project is in preliminary engineering and environmental review, and the MBTA's capital plan funds only that planning work, with no construction money.Nov 13, 2026